| |
|
NEWS
|
Pharmacy
Quality of pharmaceutical production is put by technology and the manufacture organization, including the cleanliness of technological mediums. Since 2000 Miass Factory of Medical Equipment has carried out designing and construction of cleanrooms for different fields of industries. As the base for this direction of activity 10-years-old experience of our factory in creation of cleanrooms for medical units serves...
|
CLEANROOM
- Air treatment, decontamination and distribution system;
- Climate control system;
- Cleanroom structure (structural elements providing leakproofness);
- medical, technological and engineering equipment integrated with the cleanroom structure.
|
|
|
Box for weightening
|
|
| АМС МЗМО/English Version/Production/Production run equipment/Box for weightening
|
Appointment:
- maintenance of appropriate conditions according to requirements GMP at sampling, weighing of powder substances in which course undesirable suspensions of microparticles can be formed
- simultaneous protection of raw materials, the personnel and premise environment
- creation of an individual workplace at the enterprises of the various industry with high requirements to cleanliness of air.
Demanded parameters on cleanliness of air in a working zone are provided with three-stage clearing by filters of classes G4, F7 and H14 in a working zone. As much as possible provided class of cleanliness of air corresponds to A class. And in accordance with GOST R 52249-2004 and to a class 5 ISO in accordance with GOST R ISO 14644-1-2002
Scopes
- Pharmaceutical manufacture
- Medical industry
- Microbiological industry
- Various laboratories
|

Box for sampling and weightening
|
Construction
The cleanroom represents the independent module with a vertical stream of air. Fulfilled air is thrown out back in a premise by means of the fan, having passed preliminary clearing through built in in exhaust system of ventilation НЕРА filters.
The basic technical characteristics
Overall dimensions (LхWхH), mm
|
2100х1580х2430 |
| Sizes of a working zone (LхWхH), mm |
1230х1240х1900 |
Three-stage system of a filtration of air
|
Monitoring of a contamination of filters of each step
|
Flameproof execution of an electric equipment
|
| Speed of an air stream in a working zone |
from 0, 30 to 0, 60 m/s |
Noise level no more
|
65 dB |
| Power supplies |
380 V, 3 phases |
| Мaximum power consumption no more |
2, 5 kWt |
| Clearing degree in accordance with GOST R 51251-99 from the weighed particles in the size more than 0, 3 microns |
99, 995 % |
| Light exposure of a working zone, not less |
1000 lx |
Terms of replacement of filters are defined by indications of manometres and roughly make: for filters of class G4 – 1 year, filters of class F 7 2 years, filters of class H 14 – 4 years.
Order variant:
Box of air clearing and disinfecting BОV-001-АМS (an execution variant «the cleanroom for sampling»)
|
|
|
|